How Long Does an Office Fit-Out Take? A Step-by-Step Timeline

Planning an office fit-out can be an exciting yet complex process. Whether you are moving into a new workspace or refurbishing your existing office, understanding the timeline of a fit-out is crucial to ensure a smooth transition. The duration of an office fit-out depends on various factors, including the size of the office, the complexity of the design, and the approvals required.

A well-planned fit-out ensures minimal disruption to business operations while creating a workspace that enhances productivity and reflects your brand identity. In this article, we will provide a comprehensive step-by-step timeline for an office fit-out, helping you understand what to expect at each stage of the process.

Fully furnished and operational office after fit-out handover

Factors Influencing the Fit-Out Duration

Before diving into the timeline, it is essential to consider the key factors that impact how long an office fit-out takes:

1. Size of the Office Space

Larger spaces require more time to plan and execute, as they involve more materials, manpower, and logistics.

2. Complexity of Design and Customisation

A straightforward fit-out with standard office features will take less time than a highly customised design that includes bespoke joinery, unique layouts, and advanced technology integration.

3. Regulatory Approvals and Permits

Depending on the location of the office, obtaining planning permissions, landlord approvals, and compliance certificates can impact the timeline.

4. Availability of Materials and Lead Times

Delays in sourcing furniture, fixtures, or specialised materials can extend the duration of the fit-out.

5. Coordination with Stakeholders

Effective communication with designers, contractors, and suppliers ensures that the project progresses without unnecessary setbacks.

Now that we understand the factors involved, let’s break down the typical timeline of an office fit-out.

Step-by-Step Office Fit-Out Timeline

1. Discovery Phase (4-6 Weeks)

The discovery phase is the foundation of a successful office fit-out. During this stage, the project team works closely with stakeholders to understand the company’s vision, requirements, and budget.

Key Activities:

  • Conducting initial consultations and site assessments
  • Identifying workspace requirements, including capacity and functionality
  • Establishing project objectives and deliverables
  • Setting a realistic budget and timeline

2. Design Development (2-4 Weeks)

Once the initial planning is complete, the next step is to develop the office design. This involves creating visual concepts and layouts that align with the company’s brand and operational needs.

Key Activities:

  • Creating 2D and 3D design concepts
  • Gathering feedback from stakeholders
  • Finalising spatial planning and layout
  • Selecting materials, finishes, and furnishings

3. Documentation & Approvals (4-6 Weeks)

Before construction begins, necessary approvals and documentation must be obtained. This step ensures compliance with building regulations and landlord requirements.

Key Activities:

  • Preparing detailed technical drawings
  • Submitting applications for planning permission and regulatory approvals
  • Acquiring landlord consent where applicable
  • Resolving any compliance-related issues

4. Preliminary Works (1-2 Weeks)

This stage involves preparing the site for construction, ensuring it is ready for the fit-out process to begin.

Key Activities:

  • Implementing health and safety measures
  • Setting up temporary site access and welfare facilities
  • Establishing waste management procedures

5. Strip-Out Phase (1-2 Weeks)

If the office is undergoing refurbishment, the existing fixtures and fittings need to be removed before the new fit-out can begin.

Key Activities:

  • Demolishing old partitions, flooring, and ceilings
  • Removing redundant electrical and mechanical systems
  • Disposing of waste responsibly

6. Mechanical & Electrical Installations (6-10 Weeks)

This phase focuses on installing essential infrastructure such as heating, ventilation, air conditioning (HVAC), lighting, and power supply.

Key Activities:

  • Installing new mechanical and electrical systems
  • Implementing IT and audiovisual solutions
  • Conducting system testing and inspections

7. Fit-Out Construction (5-8 Weeks)

With the core infrastructure in place, the office fit-out progresses to the construction phase, where key elements of the workspace take shape.

Key Activities:

  • Installing partitions, ceilings, and flooring
  • Fitting bespoke joinery and feature walls
  • Painting and decorating to match the design aesthetic

8. Furniture Installation (1 Week)

Once construction is complete, furniture installation brings the workspace to life.

Key Activities:

  • Delivering and assembling office furniture
  • Arranging desks, seating, and storage units as per the layout
  • Installing breakout and collaboration spaces

9. Commissioning & Handover (1 Week)

The final stage ensures that all systems and installations are functioning correctly before handing over the office space to the client.

Key Activities:

  • Conducting final inspections and snagging
  • Testing lighting, HVAC, and IT infrastructure
  • Providing user manuals and operational guidance
Final touches being added to office interior during fit-out completion

Post-Fit-Out Considerations

Even after the fit-out is complete, there are important steps to ensure a smooth transition into the new office.

Employee Orientation and Move-In

Providing employees with an office orientation helps them familiarise themselves with the new layout, facilities, and technology.

Ongoing Maintenance and Support

A well-maintained office ensures longevity and efficiency. Engaging with a professional fit-out company for ongoing support can help address any post-occupancy adjustments.

Collecting Feedback

Gaining employee feedback helps identify any additional improvements that can enhance the workspace experience.

Conclusion

The timeline for an office fit-out varies depending on several factors, but with careful planning and expert guidance, businesses can achieve a seamless transition to their new workspace. From initial discovery to final handover, each stage plays a crucial role in ensuring a successful fit-out.

At Corporate Interiors, we specialise in delivering high-quality office fit-outs that align with your business needs. Our experienced team manages the entire process, ensuring efficiency, compliance, and exceptional results. If you’re considering an office fit-out and want expert guidance, get in touch with us today to start your project with confidence.

Office Fit Out

Do you have a project in mind?

From a full office redesign and fit out to the installation of a hung ceiling or racking system, we provide solutions for all. Want to know more?